Why did Indonesia Fail to Build its First Nuclear Power Plant in Muria, Jepara?
Abstract
In order to achieve net zero emission and national energy resilience BAPETEN has announced that the Indonesian government plans to build a new nuclear power plant by 2039. While the new plans to build a new nuclear power plant by 2039 remains to be seen, this article aims at revisiting the question of why did Indonesia, under President Yudhoyono administration fail to build its first nuclear power plant in Muria, Jepara. This article argues the failure to build the first nuclear power plant was caused by strong resistance to the nuclear power plant from the civil society movements due to the lack of trust towards the government in handling the risks of nuclear. Hence, any plans to build nuclear power plant in Indonesia in the future should address attentions to public trust regarding the risks of the using of nuclear energy.
Keywords
Full Text:
PDFReferences
References
Books
APEC. (2006). APEC Energy Demand and Supply Outlook. Japan: Asia Pacific Energy Research Center
Ministry of Energy and Mineral Resources. (2008). Handbook of energy and economic statistic of Indonesia. Jakarta
Robison, R. and V.R., Hadiz. (2004). Reorganising Power in Indonesia: The Politics of Oligarchy in the age of Market. London and New York: Routledge.
Smith, B. (2007). Hard Times in the Lands of Plenty. Ithaca: Cornell University Press
Journals and Periodicals
Amir, S. (2010). Nuclear Revival in Post Soeharto Indonesia. Asian Survey.50 (2). pp. 265-286.
Amir, S. (2009). Challenging Nuclear: Antinuclear Movements in Post Authoritarian Indonesia. East Asian Science, Technology and Society: An International Journal. 3 (2-3). pp. 343-366.
Boyd, M. A. Devero, J. Frias, J. Meyer and G. Ross (2010). A Note on Policies for the Oil and Gas Sector. Bulletin of Indonesian Economic Studies. 46(2). pp. 237-48.
Cornejo, R. M. (2000). When Soekarno Sought the Bomb: Indonesian Nuclear Aspiration in the Mid-1960s. The Nonproliferation Review. (Summer). pp. 31-43.
Indriyanto, A.R.S., B. A.T. Wattimena, H. Batih, I.S. Triandi. (2007). Overview on Energy Unavailability. Indonesia Energy Economic Review, 2. pp 1-10.
Sastratenaya, A S., A. Sudi. (2010). Nuclear Energy Development in Indonesia’, IAEA TC workshop long range planning, Vienna, June 14-17.
Schlapfer, A. (1996). Reactor on the Ring of Fire: Implication for Indonesia's Nuclear Program. Working Paper No. 65, Perth: Asia Research Centre, Murdoch University. July.
Siegel, J. T. (1998) Early Thoughts on the Violence of May 13 and 14, 1998, in Jakarta. Indonesia, 66, October. pp. 75-108.
Tanter, R., A. Imhoff and D.von Hippel. (2009) Nuclear Power, Risk Management and Democratic Accountability in Indonesia: Volcanic regulatory, financial risk in the Muria Peninsula nuclear power proposal. Australia Policy Forum 09-22A, 7 Desember.
Tumiwa, F. (2008). Indonesia Energy (In) security. Regional Workshop on Energy and Non-Traditional Security, Singapore: RSIS Center for Non-Traditional Security Studies. 28-29 August 2008.
Websites
Antara. (4 December 2022). Govt Plans to Build Nuclear Power Plant in 2039: Bapeten. Retrieved 20 January 2023. https://en.antaranews.com/news/263791/govt-targets-to-build-nuclear-power-plant-in-2039-bapeten
Atje, R. and I. Hapsari. (2010). Energy Security: an Indonesian Perspective’, downloaded 10 November 2010. http://www.rsis-ntsasia.org/activities/conventions/2008-beijing/atje.pdf
Kusuma, R. R. Indonesian Government Eyeing Bangka Island for 2 Nuclear Power Plants. Retrieved 10 November 2010. http://www.thejakartaglobe.com/bisindonesia/indonesian-government-eyeing-bangka-island-for-2-nuclear-power-plants/403789
Lee, L. (2010, 19 June). No Plans for Nuclear Power in Indonesia. The Strait Times, Retrieved 10 November 2010. http://www.asianewsnet.net/home/news.php?id=12605&sec=1
Newman, N. (2010). Indonesia wrestles with its chronic electricity crisis. Retrieved 10 November 2010 http://www.powergenworldwide.com/index/display/articledisplay/0493388766/articles/power-engineering-international/volume-18/issue-9/power-report/indonesia-wrestles-with-its-chronic-electricity-crisis.html
Nugroho, H (2010, 05 May). Development of nuclear power in Indonesia: Stop or go? Retrieved 4 October 2010. http://www.thejakartapost.com/news/2010/05/05/development-nuclear-power-indonesia-stop-or-go.html
Nugroho, H (2010, 30 May) Indonesia energy-economy potentials, challenge. Retrieved 4 October 2010. http://www.thejakartapost.com/news/2010/05/30/indonesian-energyeconomy-potentials-challenges.html
Rustam, S.J. (2010, 03 July). Indonesian nuclear energy plan: A peer review. Retrieved 10 November 2010. http://www.thejakartapost.com/news/2010/07/03/indonesian-nuclear-energy-plan-a-peer-review.html
Wirakusuma, K Y. (2009 05 April). SBY Janji tak bangun PLTN di daerah yang di tolak’ (SBY promises not to build nuclear power in public rejected areas). Retreived 10 November 2010. http://news.okezone.com/read/2009/04/05/1/207872/1/sby-janji-tak-bangun-pltn-di-daerah-yang-ditolak
Indonesia. retreived 10 November 2010. available at http://www.world-nuclear.org/info/inf102.html
Presidential Decree No. 5/ 2006. Retrieved 20 January 2023. https://jdih.kemenkeu.go.id/fulltext/2006/5TAHUN2006PERPRES.HTM
Law No. 17/ 2007 on National Long-Term Development Planning year 2005-2025. Retrieved 20 January 2023. https://peraturan.bpk.go.id/Home/Details/39830
Demo Anti PLTN Merambat ke Kudus’(Antinuclear protests spread to Kudus). Retrieved 10 November 2010 http://antinuklirjepara.blogspot.com/2008/04/demo-anti-pltn-merambat-ke-kudus.html
Kalimantan Timur Siap Jadi Lokasi PLTN (East Kalimantan ready to Host Nuclear Power Plant). 9 February 2010. Koran Tempo
Survey says most people accept nuclear power plant. 24 August 2010. The Jakarta Post,
Activists warn against nuclear use to meet phasing-out target . 11 August 2010. The Jakarta Post.
DOI: https://doi.org/10.31315/paradigma.v27i2.10203
Refbacks
- There are currently no refbacks.
Copyright (c) 2023 Aryanta Nugraha
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Paradigma: Jurnal Masalah Sosial, Politik, dan Kebijakan
Published by Faculty of Social Science and Political Science
Universitas Pembangunan Nasional "Veteran" Yogyakarta
(Kampus Unit II) Jl. Babarsari 2, Tambakbayan, Depok, Yogyakarta 55281
Phone: +62 274 486733. Email: [email protected]
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.